MDRS was withdrawn from Auckland in October 2025 and replaced by Plan Change 120. Here’s what actually applies to your property in 2026, plain English.
Heritage overlay Auckland rules explained for homeowners. What you can change without consent, what triggers it, and the design path that gets approved.
Do you need consent to remove an internal wall in NZ? Schedule 1 rules, the four load-path checks an LBP designer makes, and the real costs explained.
Thinking about building a duplex on your Auckland section? We break down the planning rules, real build costs, and what feasibility looks like in 2026.
Full list of building work you can do without consent in NZ. Covers sheds, decks, pergolas, retaining walls, granny flats — plus Auckland-specific catches.
The homeowner is always legally responsible for building consent in NZ — even when hiring professionals. Learn what the Building Act says and how to protect yourself.
Find out if you can sell a house without a Code Compliance Certificate in New Zealand, what it means for buyers, banks, and insurance — and how to fix it.
Planning a renovation or new build in Auckland? We break down every consent fee, levy & hidden charge — plus the exemptions that could save you thousands.
Will AI replace architects in NZ by 2030? Auckland’s Sonder Architecture separates the hype from reality — what AI can and can’t do in residential design, and what it means for your home project. Read our full analysis.
Planning a home renovation in Auckland? Learn when you need a building consent for renovations, from kitchens to extensions. Sonder Architects breaks down exemptions, requirements, and tips for compliance. Start your project confidently!
